In an effort to serve you better, the SPring-8/SACLA will be undergoing a scheduled power outage for maintenance during the following period:
From August 5, 4:30 pm to August 6, 9:00 pm, 2022 JST (UTC+9).
The User Information Website will be unavailable to users during this period.
There is a possibility that it will be behind schedule, depending on the work situation.
We apologize for the inconvenience, and thank you for your patience.
“Proposal Application”, “Notification of Completion of Beamtime”, “Experiment Summary Report” and “User Information Mypage Login” will be also unavailable during the maintenance.
Please save the application being created before the maintenance.
The Office will be closed from August 6 to August 7 (all day)
Temporary Closure Notice of Radiation Control Office Reception Desk of RIKEN Harima Safety Center at North Building
[The entrance card reader system]
The entrance card reader system will be shut down (exclude some doors that for examination) during the following period:
August 6, from 5:00 am to 6:00 pm.
( – August 7, 6:00 pm, if the power outage will be rescheduled on August 7)
[Radiation Controlled Area]
Almost doors to the radiation controlled area will be closed during the following period:
August 6, from 5:00 am to 6:00 pm.
( – August 7, 6:00 pm, if the power outage will be rescheduled on August 7)
[OA Network]
OA network will not be available due to the scheduled power outage.
Downtime: August 5, 6:00 pm – August 6, 7:00 pm
( – August 7, 7:00 pm, if the power outage will be rescheduled on August 7)
If instrument failure occur after the power outage, the network down might continue until August 8.
[Guest House]
Please note the following points if you stay in the guest house on August 6 and August 7.
Electricity will be cut August 6, from 5:00 am to 6:00 pm.
Water will be cut August 7, from 9:00 am to 5:00 pm.
*Although the power outage will be scheduled on August 6,
in case of unfavorable weather such as a typhoon, it will be conducted on August 7 instead.
1. Electrical equipment (Air conditioner, refrigerator, hot water, bathroom etc.) in the guest rooms is not available.
2. Elevators are not available in all the Guest House buildings.
3. Automatic casher and credit cards are not available.
[Cafeteria and Convenience Store]
Following period is not available.
Cafeteria: From August 6 to August 7 (all day), August 8 (breakfast time)
Convenience Store: From August 6 to August 7 (all day)
ATM: From August 5, 2:00 pm to August 8, 12:00 pm